Projects Recently Completed:
  1. Gyratory Crusher Lubrication and Hydroset Hydraulic System
  2. Regrind Mill Lubrication / Lift System (1000L)
  3. SAG Mill Lubrication / Lift System (1500L)
  4. 4 x 55kW Drill Rig Hydraulic systems
  5. 7 x Tractor mounted Drill Rig Hydraulic Systems
  6. Mechanical Design Conveyor Drive Assemblies (Pilbara Iron BME Project)
  7. Rockbreaker Hydraulic System (Pilbara Iron)
  8. Ball Mill Lubrication System (1000L)
  9. Ball Mill lubrication system refurbishment / upgrade
  10. Regrind Mill Lubrication System (1000L)
  11. 2 x Heliportable Drill Rigs
  12. 4 x 45kW Tray mounted drill rigs
Examples:
click to enlarge click to enlarge click to enlarge click to enlarge
View design drawing View design drawing

Projects Under Construction:
  1. 3 x 110kW Luff Systems
  2. 3 x Operator Cabin Levelling power packs
  3. 3 x ancillary packs for belt feeder positioning and ancillary functions